Uncategorized MIDLAND DR BETWEEN MORAY CT AND LADER DR HAS INTERMITTENT LANE CLOSURES DUE TO CONSTRUCTION UNTIL 5PM Post Content
Uncategorized N WALNUT ST BETWEEN E 8H ST AND E 12TH ST HAS A LEFT LANE MERGER WORKING IN THE AREA UNTIL 5PM Post Content
Uncategorized RT 1 NORTHBOUND AT MILE MARKER 76 THERE ARE LITTER CREWS WORKING IN THE MEDIAN UP TO POLE BRIDGE UNTIL 3 PM. Post Content
Uncategorized I-95 NORTHBOUND BETWEEN EXIT 5 AND THE PA LINE HAS LITTER CREWS WORKING ON THE MEDIAN UNTIL 300PM Post Content
Uncategorized I-95 NORTHBOUND BETWEEN THE WELCOME CENTER AND THE MARYLAND LINE HAS LITTER CREWS WORKING ON THE MEDIAN UNTIL 230PM Post Content
Uncategorized S DUPONT HWY (RT 13) NORTHBOUND AND SOUTHBOUND BETWEEN CHRISTIANA RD (RT 273) AND THE 495 RAMP HAS A TRASH OPERATION ON THE SHOULDER UNTIL 3PM Post Content
Uncategorized I-95 SOUTHBOUND AT EXIT 5C ONTO THE I-295 BRIDGE THERE IS A LEFT SHOULDER CLOSURE DUE TO CONSTRUCTION UNTIL 3PM Post Content
Uncategorized S WALNUT ST BETWEEN 5TH ST AND 12TH ST HAS A LEFT LANE CLOSURE DUE TO CONSTRUCTION UNTIL 6PM Post Content