Uncategorized RT-13 SB HAS RIGHT LANE CLOSED FROM SUMMIT BRIDGE RD (71) TO BLACKBIRD FOREST RD DUE TO CONSTRUCTION TILL 7/25/25 AT 12PM Post Content
Uncategorized RT 1 SB FROM ROTH BRIDGE TO BLACKBIRD LANDING RD 10-15 MIN DELAY DUE TO CONGESTION Post Content
Uncategorized RT 13 SB FROM ST. GEORGES BRIDGE TO BOYDS CORNER HAS A 10-15 MIN DELAY DUE TO CONGESTION Post Content
Uncategorized RT 13 SB FROM SIMMS WOODS RD TO LEIPSIC RD HAS A 10-15 MIN DELAY DUE TO CONGESTION Post Content
Uncategorized US 13 NB FROM SCHAFER BLVD TO N OAK ST THE LEFT LANE IS CLOSED UNTIL 6AM FOR CONSTRUCTION Post Content
Uncategorized ROUTE 40 EB FROM WILTON BLVD TO N OAK ST THE RIGHT LANE IS CLOSED UNTIL 6AM FOR CONSTRUCTION Post Content
Uncategorized US 13 SB FROM 1ST AVE TO LLANGOLLEN BLVD THE LEFT LANE IS CLOSED UNTIL 6AM FOR CONSTRUCTION Post Content
Uncategorized AIRPORT RD NB AT CHURCHMANS RD THE RIGHT TURN LANE IS CLOSED UNTIL 3:30AM FOR CONSTRUCTION Post Content
Uncategorized DE 1 NB FROM REHOBOTH TO LEWES THERE ARE 5 TO 10 MINUTE DELAYS DUE TO HIGH TRAFFIC VOLUME Post Content
Uncategorized I 95 FROM DE 273 TO DE 1 THE MEDIAN SHOULDERS IN BOTH DIRECTIONS ARE CLOSED DUE TO CONSTRUCTION UNTIL JULY 24TH AT 7AM Post Content