Uncategorized DE 4 WB FROM DE 273 TO SALEM CHURCH RD. HAS RIGHT LANE AND RIGHT TURN LANE CLOSED DUE TO CONSTRUCTION UNTIL 5AM. Post Content
Uncategorized ROUTE 13 SB FROM LOREWOOD GROVE RD. TO PORT PENN RD., HAS INTERMITTENT LANE CLOSURES UNTIL 5:30AM FOR CONSTRUCTION. Post Content
Uncategorized KIRKWOOD HWY. (DE 2) EB HAS TWO RIGHT LANE CLOSURES FROM OGLETOWN RD. (DE 273) TO POPLAR AVE DUE TO CONSTRUCTION UNTIL 5 AM. Post Content
Uncategorized I-95 SB FROM ROUTE 72 TO THE NEWARK TOLL PLAZA, THE TWO RIGHT LANES ARE CLOSED UNTIL 7AM FOR CONSTRUCTION. Post Content
Uncategorized I-95 NB HAS 3 LEFT-LANE CLOSED AT AIRPORT RD. EXIT 5A TO THE I-495 NB / I-95 SPLIT, UNTIL 5AM DUE TO CONSTRUCTION. Post Content
Uncategorized ROUTE 141 SB AT EXIT 3A, THE ON RAMP TO I-95 IS CLOSED UNTIL 5AM FOR CONSTRUCTION. Post Content
Uncategorized W NEWPORT PIKE EB ONE LANE CLOSED AT STANTON ROAD – SIGNAL ON FLASH IN EB AND WB DIRECTION WITH TROOPER ON SITE DUE TO CONSTRUCTION UNTIL 4PM. Post Content
Uncategorized W NEWPORT PIKE WB BETWEEN PETRO DRIVE AND STANTON ROAD RIGHT LANE CLOSED DUE TO CONSTRUCTION UNTIL 4PM. Post Content
Uncategorized I-95 NB AT THE I-495 NB SPLIT, THE RIGHT LANE IS CLOSED UNTIL 5AM FOR CONSTRUCTION. Post Content