Uncategorized BOYDS CORNER RD FROM US-13 TO SHALLCROSS RD HAS INTERMITTENT LANE CLOSURES UNTIL 5AM. Post Content
Uncategorized RT 2 WB HAS THE RIGHT LANE CLOSED BETWEEN GREEN VALLEY CIR AND HARMONY RD UNTIL 6 AM. Post Content
Uncategorized I 95 SB HAS A MOBILE STRIPING OPERATION BETWEEN THE WELCOME CENTER AND THE TOLL LANES UNTIL 5:00AM Post Content
Uncategorized RTE 896 NB HAS A MOBILE STRIPING OPERATION BETWEEN COBBLE CREEK CURVE TO WELSH TRACT RD UNTIL 5:00AM Post Content
Uncategorized RTE 896 SB HAS A MOBILE STRIPING OPERATION BETWEEN WELSH TRACT RD TO COBBLE CREEK CURVE UNTIL 5:00AM Post Content
Uncategorized EAST 12TH STREET HAS THE RIGHT LANE CLOSED BETWEEN RAILROAD AVE AND HAY ST. UNTIL 11:30 PM DUE TO CONSTRUCTION. Post Content
Uncategorized THE INTERSECTION OF FAULKLAND RD (DE 34) AND CENTRE RD (DE 141) HAS INTERMITTENT LANE CLOSURES DUE TO CRASH Post Content
Uncategorized I 95 HAS A NB DOUBLE LEFT LANE CLOSURE BETWEEN RTE 1 AND EXIT 5A FOR CONSTRUCTION UNTIL 5:00AM Post Content
Uncategorized THE RAMP FROM DE-896 SB TO I-95 SB IS CLOSED DUE TO CONSTRUCTION UNTIL 7/31/26 Post Content