Uncategorized ROUTE 273 WB FROM CHURCHMANS RD TO ROUTE 13 HAS THE RIGHT LANE CLOSED UNTIL 5AM FOR CONSTRUCTION Post Content
Uncategorized CHURCHMANS RD WB FROM ROUTE 273 TO PRAMUKH SWAMI WAY THE RIGHT LANE HAS AN INTERMITTENT LANE CLOSURE UNTIL 5AM FOR CONSTRUCTION Post Content
Uncategorized I 295 NB AT DE 141 INTERCHANGE HAS EXIT 5B, OFFRAMP TO DE 141, AND EXIT 2, DE 141 OFFRAMP TO I 295 NB, CLOSED DUE TO CONSTRUCTION UNTIL 6/9/2025 AT 6AM. Post Content
Uncategorized ROUTE 13 SB FROM MILLSIDE DR TO ROGERS RD THE LEFT TURN LANE IS CLOSED UNTIL JUNE 8TH 2025 AT 12PM FOR CONSTRUCTION Post Content
Uncategorized RT1 NB FROM THE SOUTH SMYRNA EXIT TO THE MIDDLETOWN ODESSA EXIT HAS MOBILE LITTER CREWS WORKING UNTIL 3PM Post Content
Uncategorized ROGERS RD EB RIGHT LANE CLOSED BETWEEN S. MARKET AND S. HEALD FOR CONSTRUCTION UNTIL 15:30 Post Content
Uncategorized SUMMIT BRIDGE RD FROM PULASKI HWY TO RED LION RD HAS LITTER CREWS WORKING IN THE SHOULDER UNTIL 4PM Post Content
Uncategorized I95 SB FROM THE PA LINE TO THE WELCOME CENTER HAS LITTER CREWS WORKING IN THE MEDIAN UNTIL 4:30PM Post Content
Uncategorized UTILITY CONSTRUCTION WILL HAVE THE RIGHT TURN LANE ON 896 NB CLOSED AT OLD SUMMIT BRIDGE RD UNTIL 2PM Post Content
Uncategorized I-95 SB AT RT-273 HAS A 10 TO 15 MIN TRAFFIC DELAY DUE TO A DISABLED TRACTOR TRAILER TAKING THE TWO LEFT LANES Post Content