Uncategorized EAST 12TH STREET HAS THE RIGHT LANE CLOSED BETWEEN RAILROAD AVE AND HAY ST. UNTIL 11:30 PM DUE TO CONSTRUCTION. Post Content
Uncategorized THE INTERSECTION OF FAULKLAND RD (DE 34) AND CENTRE RD (DE 141) HAS INTERMITTENT LANE CLOSURES DUE TO CRASH Post Content
Uncategorized I 95 HAS A NB DOUBLE LEFT LANE CLOSURE BETWEEN RTE 1 AND EXIT 5A FOR CONSTRUCTION UNTIL 5:00AM Post Content
Uncategorized THE RAMP FROM DE-896 SB TO I-95 SB IS CLOSED DUE TO CONSTRUCTION UNTIL 7/31/26 Post Content
Uncategorized NAAMANS RD HAS AN EB LEFT LANE CLOSURE BETWEEN PEACH TREE LN AND HICKMAN RD FOR CONSTRUCTION UNTIL 6:00AM Post Content
Uncategorized I-95 NB FROM THE BIDEN WELCOME CENTER TO CHURCHMANS MARSH HAS A 5 TO 10 MINUTE DELAY DUE TO CONGESTION. Post Content
Uncategorized CAPITOL TRAIL EB FROM ROUTE 273 TO E. CLEVELAND AVE, THE LEFT LANE AND LEFT TURN LANE ARE CLOSED UNTIL 6AM FOR CONSTRUCTION. Post Content
Uncategorized E. CHESTNUT HILL RD. WB FROM ROUTE 273 TO SALEM CHURCH RD., THE LEFT LANE AND LEFT TURN LANE ARE CLOSED UNTIL 5AM FOR CONSTRUCTION. Post Content
Uncategorized CAPITOL TRAIL WB FROM E. GREEN VALLEY CIRCLE TO HARMONY RD., THE LEFT LANE IS CLOSED UNTIL 5AM FOR CONSTRUCTION. Post Content